Extra notes from card index
• L10E: (at end of log) 2 days digging.
• L11S: Photos from Easter
Orphan card index date references to logbook pages
• [05/08/2007] Very good draught on hot day.
• [30/07/2010] Digging. (See account near end of summer log)
Dated logbook entries with card index notes
2006
April 14th - Easter log -
2006e-23 -
Entrance seen near to road. Some draught?
2007
August 6th - summer log -
2007s-33 -
Some digging. Some draught on a cool day.
2009
October 18th - autumn log -
2009a-02;
2009a-03 -
Digging in loose roof passage.
2010
January 1st - Easter log -
2010e-38
July 29th - summer log -
2010s-23 -
Digging.
July 31st - summer log -
2010s-23
January 1st - summer log -
2010s-74
2011
April 24th - Easter log -
2011e-39 -
Surveyed. TL=76m d=29m
Account near end of log.
2012
August 22nd - summer log -
2012s-78 -
Inlet at top of last pitch pushed for 15m. Becomes too low.
Shaft needs capping between base and 3rd chamber.
Photos.
2013
August 27th - summer log -
2013s-88 -
H Long comm. Possibility that site 3910 sump is window into Regato (0672) to Nacimiento de Campiazo (1106), probably picking up water from Coercion Cave (2739). Also possibly involved in this system could be wet weather sink cave (site 2687), Huerta Rey 2519, Hole in the Bend 2415 and small sites 2760 - 2765 above Campiazo.
2026
August 13th - summer log -
2026s-48;
2026s-49 -
Entrance debris removed. Draughts.
Rebolting the second half of the entrance pitch is required so the rest of the cave can be explored further. Throughout the cave there is lots of loose large rock, so take care.
August 15th - summer log -
2026s-61 -
Re-explored with some additions / corrections to the description. Survey is just extra drawings. Extra length not included.
Published documents: print and digital