April 11th - Easter log -
2006e-11 -
3m wide, 10m deep undescended shaft.
April 11th - Easter log -
2014e-05;
2014e-06 -
Best described as a cave.
Bolt wall to give a 7m ladder climb down into large chamber. Explored and described to an undescended pitch under a collapse.
April 13th - Easter log -
2014e-09 -
2nd pitch descended into a chamber with another drop.
April 14th - Easter log -
2014e-24 -
At base of rubble slope: 2 possible ways on.
W rift too tight.
E rift - small rifts on cross joints - 8m to a small hole in calcite flow.
More work required.
April 18th - Easter log -
2014e-30 -
More progress @ leads below 2nd pitch.
See log book.
April 19th - Easter log -
2014e-40;
2014e-41;
2014e-42;
2014e-43 -
Full page report in log of various bits / leads pushed.
About 60m in total. Sketches in log.
d=15m?