March 28th - Easter log -
2005e-20 -
Rift in bottom of rubbish tip. Possible sink dig infloor.
Needs look in warm weather.
August 6th - summer log -
2011s-42;
2011s-56 -
Entered down into streamway - up and down. Needs stabilising.
August 7th - summer log -
2011s-56 -
Surveyed. Batches 11-01, 02, 03
TL=320.4m d=39.9m
December 23rd - Xmas - New Year log -
2018c-01 -
To bottom of cave. Any leads checked out.
Too tight downstream. Capping required.