Extra notes from card index
• 1999: Subsequently Hilti capped, banged by Catalans. Still going. Best in floor. L=8m
• 13/11/21 Drawn survey
Orphan card index date references to logbook pages
• [09/08/1980] on sheets - discovered
Dated logbook entries with card index notes
1984
August 2nd - summer log -
1984s-24 -
Relocated and dug. Draughts. Same hole? "40yds off road"?
August 3rd - summer log -
1984s-32 -
Digging
1999
August 4th - summer log -
1999s-22 -
Looked at. Draughts. Good dig.
2006
July 23rd - summer log -
2006s-01
2021
July 27th - summer log -
2021s-05 -
Capping. Good draught.
July 31st - summer log -
2021s-11 -
Camera on stick. Straight ahead closes up. The left hand wall may cut under. No draught.
August 4th - summer log -
2021s-17 -
Digging out floor
August 7th - summer log -
2021s-24 -
Clearing boulders.
Surveyed L=7.2m d=3.3m
2022
April 14th - Easter log -
2022e-32 -
Digging - flood debris in lower part.
August 21st - summer log -
2022s-48 -
Some digging
2025
July 23rd - summer log -
2025s-04 -
Inspected. Best with 3 people for digging.
July 28th - summer log -
2025s-12 -
Will be a mining job.
July 30th - summer log -
2025s-18 -
Digging.
August 4th - summer log -
2025s-27 -
Good draught. Some capping.
December 23rd - Xmas - New Year log -
2025c-06 -
Bat seen.
2026
August 11th - summer log -
2026s-44 -
Digging. Cool draught out.
August 15th - summer log -
2026s-53 -
Continue digging.
Published documents: print and digital
• [P1]
Corrin J et al, 1981b Matienzo Expeditions 1979-80 J. Manchester University Speleological Society No. 10
• p3