MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#1930 Cobadal, Sumidero de
Cobadal - 30T 0448666 4797809 Altitude: 219m - Length: 7493m Depth: 101m
Website description for site 1930   |   Site in context, area map

Extra notes from card index
• (See new entrance digging account "12/13 April")
• End of Easter: TL=4020.5m VRange = 52.6m
• Total for Easter 2007 = 63.5 TL=6531 VR=102m

Orphan card index date references to logbook pages
• [14/04/2004] New: down p3 + p6 pitch with 150m passage to bouldery chamber with high levels. GR changed - see top of card.
• [18/07/2004] Trip to boulder choke at end downstream. Various leads to look at - see log book.
• [26/07/2004] (1) Batch 27 - Big Keyhole - RH branch 88.4 TL=5300.1m (2) Batch 28 - Top Tip 16.2m new TL=5316.3 (3) Batch 29 - Evidence Oxbow 140m TL=5456.3m
• [05/08/2004] Snappers used in top of choke. Not inspected; allowed to settle.
• [20/04/2006] Round trip: Dry Series > Choke > upstream to entrance.
• [08/05/2010] Entrance partially collapsed.

Dated logbook entries with card index notes

1975

January 1st - summer log - 1975s-57; 1975s-58

2002

March 31st - Easter log - 2002e-18

2003

August 1st - summer log - 2003s-12; 2003s-12 - Hilti capped draughting slot. 10m deep too tight. L=12m d=10m

2004

April 9th - Easter log - 2004e-19 - Enlarged 2 sections.
April 10th - Easter log - 2004e-22; 2004e-23; 2004e-25 - Into stream passage 500m downstream.
April 11th - Easter log - 2004e-29 - Surveyed downstream - still going.
April 12th - Easter log - 2004e-34; 2004e-36 - (a) More digging for new entrance @ 554 (b) Inlets surveying.
April 13th - Easter log - 2004e-34; 2004e-35; 2004e-36; 2004e-38 - (a) Push downstream to 3m pitch. TL now approx. 2200m (b) New entrance in 553 depression.
April 15th - Easter log - 2004e-38; 2004e-39 - Survey upstream below pitches from stn 13. Passage of Vom.
April 16th - Easter log - 2004e-41; 2004e-42 - Wessex Inlet surveyed. Surveyed beyond p3 in Vom.
April 17th - Easter log - 2004e-42 - Bits and pieces looked at.
April 18th - Easter log - 2004e-45
April 19th - Easter log - 2004e-43; 2004e-47 - Continued beyond Vom in "Just an Inlet" Still open and going.
April 27th - Easter log - 2004e-48
May 31st - Whit log - 2004w-01 - Connected loop down p5. Explored in 2 directions - one links with station 228. L=150mm Explored loop - walking passage connecting stations 219 to 180. Birthday Passage 258m Total Length = 408m Cave TL= 4020.5 + 408 = 4428.5m
July 17th - summer log - 2004s-02; 2004s-03 - Into "Big Keyhole" - to 3 inlet chambers. 142m surveyed. TL=4428.5 + 142 = 4570.5m
July 23rd - summer log - 2004s-04 - Through "Big Keyhole" to downstream of Sandstone Chamber. Downstream and upstream surveyed. Surveyed 182.9m TL=4570.5 + 182.9 = 4753.4m
July 24th - summer log - 2004s-10 - Maze area extensions Batch 023 121m TL=4874.3m
July 25th - summer log - 2004s-06; 2004s-07; 2004s-07; 2004s-08; 2004s-10 - (1) Lower passage to choke surveyed. Batch 024 116m TL=4990.3m (2) Oxbow and Aven Passage under maze 50.5 TL=5040.8 (3) Taters Deep, Mountain High 170.9m TL=5211.7m Also push in boulder choke.
July 27th - summer log - 2004s-11
July 28th - summer log - 2004s-13; 2004s-14 - Through choke to top of p11 75.1 TL=5531.4
July 29th - summer log - 2004s-21 - Downp11 to choke in rift 25.6m Survey up in draughting choke 34.8m TL=5591.8m VR = 101m
July 31st - summer log - 2004s-21 - Oxbow and Sandals Inlet surveyed. 159.8m Batches 34 + 33 TL=5751.6m
August 2nd - summer log - 2004s-27
August 9th - summer log - 2004s-33; 2004s-33 - (1) More snappers in top choke. Mud holds boulders in place. (2) Video streamway.
August 13th - summer log - 2004s-33 - Video Just an Inlet to Birthday Passage.
August 18th - summer log - 2004s-39 - Various oxbows and streamway surveyed. L=264m TL=6015.6m
October 14th - autumn log - 2004a-13
October 28th - autumn log - 2004a-07 - Started to drain Wessex Inlet sump. Good draught. 29.8 surveyed new. TL=6045.4m
November 14th - autumn log - 2004a-13

2005

January 1st - February log - 2005f-01
February 13th - February log - 2005f-00 - Evidence Oxbow Sereis Extension. (1) 1930_05_01 to the S and W 187.5m (2) 1930_05_02 to the N 34.3m TL=6267.2m
July 29th - summer log - 2005s-04 - (1) Further up in choke. (2) V. dry weather - can see 15ft along pool (flat out) in Wessex Inlet.
August 5th - summer log - 2005s-10 - Wessex Inlet dig through to calcite island with water all round. Good draught.
November 22nd - autumn log - 2005a-23

2006

January 1st - Easter log - 2006e-55; 2006e-59
April 13th - Easter log - 2006e-17 - (1) Optical brightener into bottom boulder choke. (2) Wessex Inlet pushed a few metres.

2007

January 1st - Easter log - 2007e-38
April 4th - Easter log - 2007e-11 - (i) 14m surveyed to left of passage from pitch bypass 07_01 (ii) 144.3m surveyed in Birthday Passage Extension. 07_02
April 6th - Easter log - 2007e-17 - (i) Addition to batch 07_02 24m (ii) Extensions to BP extensions L=81m Batch 07_03
January 1st - summer log - 2007s-62; 2007s-63
August 3rd - summer log - 2007s-20 - Another inlet pushed off Just an Inlet TL=286 + 6531 =6817m
August 5th - summer log - 2007s-44 - Pitch bypass + passage to south - higher level. TL=6817 + 228 = 7045m
August 7th - summer log - 2007s-36 - (1) Further surveying in Just an Inlet inlet Batches 07_06 + 07_06 [?] TL=7045+114 = 7159m (2) Some new passage off Meander Passage (not surveyed) Photos in Meander Passage.
August 16th - summer log - 2007s-58 - Surveyed maze off Meander Passage ((2) above) L=203m TL=7362m
August 18th - summer log - 2007s-60

2008

March 21st - Easter log - 2008e-16 - Wounded Knee series visited. Downstream linked to Meander Passage. Upstream to sump. About 30m surveyed. Batch ? 08_01 L=33m TL=7362+38 = 7395m
October 22nd - autumn log - 2008a-05

2009

April 7th - Easter log - 2009e-16; 2009e-16; 2009e-45; 2009e-45 - Batch 1930_09_01 (Off Vom) L=42.5 TL=7437m
April 9th - Easter log - 2009e-22; 2009e-23 - Inlet below p5 surveyed L=51m 'T4 Passage' TL=7493m
December 29th - summer log - 2005s-10

2011

April 14th - Easter log - 2011e-05 - Entrance seen. Can be dug out on next trip.
July 23rd - summer log - 2011s-10 - Dowsing reactions (wide) seen on roads above possible route to Aguanaz of the downstream water.

2012

February 9th - Jan-Feb log - 2012jf-04

2023

April 6th - Easter log - 2023e-19 - Trip to familiarise.

2024

December 10th - Xmas- New Year log - 2024c-01

Published documents: print and digital

• [EW] Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p12 - Summary.
• [EX] Corrin Juan, 2006 Expedition Report: Matienzo, Spain 2004 Speleology Issue 6, April 2006 BCRA
• pp20-22 - Summary. Survey and photos
• [EY] Corrin Juan, 2006a Expedition Report: Matienzo, Spain 2005 Speleology Issue 7, August 2006 BCRA
• pp32-33
• [EZ] Corrin Juan, 2007 Expedition Report: Matienzo, Spain 2006 Speleology Issue 9, April 2007 BCRA
• p16 - Summary of dye test with water flows.
• [FD] Corrin Juan and Smith Peter, 2007 Las Cavidades de la zona de Matienzo. La Espeleología en Matienzo, pasado, presente y futuro. Boletín Cántabro de Espelología 16, 2007
• pp31-39 - Survey, photos in Spanish summary article.
• [FF] Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• pp19-20 - Summary.
• [FM] Corrin Juan, 2009 Expedition Report: Matienzo 2008 Speleology Issue 13, May 2009 BCRA
• p18, 19, 23
• [FO] cantasub2010-vol1.pdf and cantasub2010-vol2.pdf Cantabria Subterránea Catálogo Grandes Cavidades Vol. 1 and Vol. 2
• pp272-273 - Description; survey; history
• [GH] Papard Philip, Corrin Juan and Smith Peter, 2014 Los sistemas kársticos entre Arredondo y Matienzo Boletín de la Sociedad Española de Espeleología y Ciencias del Karst No 10, Septembre 2014
• p43 - On postulated hydrology map.