Extra notes from card index
• October 2022 (not in log book) Bar (drill?) poked down through earth just below dig point.
Permission to dig required.
• Autumn '23 16-23/10 explorations in Santi's club blog.
http://actualid-ades.blogspot.com
dated 27/10/2023
Orphan card index date references to logbook pages
• [03/04/2012] Surface survey. Position altered.
• [17/04/2022] Sketch in log book.
• [19/04/2022] Pushed passage. About 350m surveyed back towards entrance.
265 + 589 TL=854m
See also full account near end of 2022e log book.
• [25/07/2023] Install tube in 5000
• [30/04/2024] All gear removed.
Surveys
06 159m
07 39m
08 52m
• [18/04/2028] Batches 25-03 126m
25-04 15m
25-05 29m
At end Easter 2025, 4VS TL = 78544m
Dated logbook entries with card index notes
2002
August 7th - summer log -
2002s-13 -
Dug out shaft top.
August 8th - summer log -
2002s-16 -
Descended 10m to static pool.
May be associated with Espada
L=15m d=10m
2012
April 10th - Easter log -
2012e-44
2013
October 18th - autumn log -
2013a-04 -
3 to 4m Ø stream passage entered leading to upstream sump.
May be almost totally sumped in wetter weather.
October 20th - autumn log -
2013a-04 -
3 to 4m Ø stream passage entered leading to upstream sump.
May be almost totally sumped in wetter weather.
TL=136m
2014
April 16th - Easter log -
2014e-23 -
Couldn't descend.
Dead goat at base of pitch.
October 25th - autumn log -
2014a-01 -
Water lowered by 5cm at upstream sump.
Diver or more work needed.
Climb checked out to tubes.
Water at base of ladder is just a pool.
2016
April 5th - Easter log -
2016e-44 -
No water heard.
April 9th - Easter log -
2016e-52 -
Flooded at base. Dived.
(1) Downstream blocked with boulders.
(2) Upstream LH pool blank after 2m.
(3) Upstream - possibly sumped to roof.
July 18th - summer log -
2016s-05;
2016s-06 -
Dive upstream 70m. Ran out of silt screws.
July 25th - summer log -
2016s-08 -
Hose failed at sump pool.
July 26th - summer log -
2016s-13;
2016s-16 -
Surveyed to previous limit added another 30m
100m in total. Passage continues sloping down. Good flow.
Length of sump = 130m
July 27th - summer log -
2016s-16;
2016s-19;
2016s-20 -
Sheep out of hole and bolts installed for easier hauling.
2 accounts
July 28th - summer log -
2016s-20;
2016s-21 -
2 x 7 litre bottles in. Sufaced in chamber.
Skecth in log book.
July 30th - summer log -
2016s-23;
2016s-29 -
Sump survey finished
Sump length =129m
TL cave = 265.3 d=17m
August 21st - summer log -
2016s-55 -
Colin Hayward.
Arch on R near end of sump inspected. Too low over a large silt bank. Dig may work.
Video of here and end chamber.
August 22nd - summer log -
2016s-55 -
Colin Hayward.
Arch on R near end of sump inspected. Too low over a large silt bank. Dig may work.
Video of here and end chamber.
August 23rd - summer log -
2016s-55 -
Colin Hayward.
Arch on R near end of sump inspected. Too low over a large silt bank. Dig may work.
Video of here and end chamber.
2017
August 15th - summer log -
2017s-48 -
Jim Lister.
Capped constriction beyond sump and broke into rift with streamway leading off.
Sump after 31m.
2018
July 21st - summer log -
2018s-13;
2018s-14 -
Passage flooded. Jim + Colin Hayward.
July 26th - summer log -
2018s-13;
2018s-14 -
Passage flooded. Jim + Colin Hayward.
August 7th - summer log -
2018s-26 -
Still flooded at base of pitch. Detackled.
2022
April 13th - Easter log -
2022e-25;
2022e-41;
2022e-50 -
Bypass excavated to Jim size.
Explored to sump 2.
April 14th - Easter log -
2022e-28;
2022e-41;
2022e-50 -
Explored beyond sump 2. Still ongoing.
April 18th - Easter log -
2022e-35;
2022e-41;
2022e-51
July 23rd - summer log -
2022s-03
August 13th - summer log -
2022s-36;
2022s-49 -
Jim and Mark dive through.
Number of leads + survey. 22-04 and 22-05 length =357m
TL = 854 + 357 = 1211m
August 15th - summer log -
2022s-39;
2022s-39;
2022s-42;
2022s-42 -
(1) Survey subphone connection to 22-05.93. Has to moved by X+34.5 and Y+1.8
Line surveyed altered. Now very close to Llanío.
account after 20th August.
2023
April 5th - Easter log -
2023e-11 -
Connected through a dig in Llanío 3234. Stn 81 in FDC seen.
See 3234 for other Easter trips in.
See annotated map in Easter log book p49
April 6th - Easter log -
2023e-15;
2023e-16
April 8th - Easter log -
2023e-27;
2023e-49
July 22nd - summer log -
2023s-07 -
(1) Dug into cave @ site 5000
(2) Climb beyond sump 2 enters passage.
July 28th - summer log -
2023s-11 -
Climb up before sump 3.
Batch 1800-23-02 L=152m
(Also on 5000)
July 30th - summer log -
2023s-13;
2023s-14 -
Pitch dropped at end of "Stone Eye Passage".
Top end [?] of sump 3.
Passage heads east. Batch 23-03 L=225m
(2 accounts)
August 9th - summer log -
2023s-38 -
Batches 4 + 5 continues Danes survey.
L=59 + 54m
(Sump 2 is 51m long after major re-draw)
August 13th - summer log -
2023s-62 -
Survey of new stuff. Failed instrument.
August 14th - summer log -
2023s-61;
2023s-71 -
Dive sump 3 - not a bypass to climb up.
October 16th - autumn log -
2023a-08;
2023a-09
October 17th - autumn log -
2023a-02 -
'Breakdown Chamber'
October 18th - autumn log -
2023a-02;
2023a-02;
2023a-03;
2023a-03;
2023a-06;
2023a-06 -
2 accounts.
Over pit @ NE side to crawl. Still going 23-08 L=74.5m
October 20th - autumn log -
2023a-04 -
West from Boob Tube. Holes choked. One still going down rift.
October 22nd - autumn log -
2023a-05;
2023a-07 -
Sketch. Ladders + SRT used to reach base @ 108m alt - about 24m down from passage.
23-09 length =58.6 Autumn additions:
58.6
74.5
157.8
=290.9
Add to 4VS
2024
February 13th - Jan-Feb log -
2024jf-06;
2024jf-07
February 16th - Easter log -
2024e-01;
2024e-02 -
Draughting in @ #5000. Floood monitors put in.
(1) p6 dropped
(2) End of Low in Knickers pushed.
Surveyed 1800-24-01 + 24-02
Length 10.4 + 3.4 =14m
(3) Rope rigged for dry access at Diamonds in the Sky.
March 26th - Easter log -
2024e-11 -
Look for possible digs through to Espada (0103). Needs dry weather.
March 29th - Easter log -
2024e-17;
2024e-18;
2024e-19 -
(Through 5000) Push at far N passage. Batch 24-03 L=61.4m
4VS TL=74071.
March 31st - Easter log -
2024e-24;
2024e-25 -
Climb up in Matienzo Hash House.
Survey to follow.
April 3rd - Easter log -
2024e-33;
2024e-34 -
(i) c15 up Surveyed sketch
Surveyed 90m
(ii) Crown Prince area. Surveyed 41.6m
April 20th - Easter log -
2024e-47 -
Dive equipment to sump 4.
Side passage dig at stn 11. Partly excavated.
April 21st - Easter log -
2024e-47 -
Upstream dive sump 4: Duck into chamber then 15m dive to X rift. Inlet requires digging.
April 23rd - Easter log -
2024e-48 -
(i) Bolting up Diamonds in the Sky. No way on.
(ii) Sump 4 dived. Mud ramp in aven climbed 16m up to a 2 x 7m passage. Closed down quickly - well decorated.
(iii) Running water inlet dug out. Walking passage 40m to sump 5, 6m long.
Walking size passage
April 24th - Easter log -
2024e-48;
2024e-49 -
(i) Past sump 5 to large sandy chamber with ways off, all choked.
(ii) 2 more short sumps. Sump 8 blocked by mud - to be dug.
Surveyed back from sump 6 to "Danes survey station at 13"
April 26th - Easter log -
2024e-49;
2024e-50 -
Pushing sump 8.
50m walk to sump 9. Sump 8 not nice - slumps
April 27th - Easter log -
2024e-50;
2024e-51;
2024e-52 -
(email) Thoughts about helictites reacting to any draughts between sumps.
April 29th - Easter log -
2024e-52 -
Sump 8 blocked. Surveyed back - photos of pretty chamber. Cock Womble.
(photos of sump 7 bypass)
October 14th - autumn log -
2024a-04 -
Extended at W end of passage just inside Boob Tube. Traverse still going.
October 19th - autumn log -
2024a-13;
2024a-14;
2024a-15;
2024a-16;
2024a-17;
2024a-18 -
Push above. Surveyed 1800-24-09
77m TL of 4VS = 76361m
October 20th - autumn log -
2024a-19;
2024a-20;
2024a-21 -
Various leads pushed. See log.
Batch 1800-24-10 L=17m
4VS TL = 76378m
2025
April 13th - Easter log -
2025e-06 -
See #5000 for 1800-25-01 L=21m
April 16th - Easter log -
2025e-21;
2025e-21;
2025e-22;
2025e-22;
2025e-24;
2025e-24 -
Sump 2 had flooded to the roof. Amended survey in log book.
(1) Connected to 3234 at 'E'
Batch 1800-25-02 L=23m links to Llanio 3234 stn 8 in low level Cross Roads Shaft. (See log for station names)
(2) Leads A B C D looked at -nothing much.
April 18th - Easter log -
2025e-28;
2025e-29 -
Batches 25-03 126m
25-04 15m
26-05 29m
Published documents: print and digital
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p14 - Summary.
• [KC] Carlisle James and Corrin Juan, 2024
Climbing the Charts in Matienzo Descent 298 June / July 2024 Stalactite Publishing, Kendal
• p22 - Mention of 40th World Length Ranking
• [KL] Corrin Juan et al, 2025
Matienzo Caves Project: Más de 50 años en el Sistema de los Cuatro Valles Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• pp147-161 - 50 Years in the 4 Valleys System (Boletín Cántabro de Espeleología, 18) pp 147 - 161
(area map + photos)
• [KQ] Corrin Juan, 2025
La Exploración de Fridge Door Cave Boletín Cántabro de Espeleología, 18 Federación Cántabra de Espeleología, Santander
• p159 - La Exploración de Fridge Door Cave
Boletín Cántabro de Espeleología, 18. p159