April 26th - Easter log -
2000e-24;
2000e-25 -
Low crawl under small scar back from little building.
After 5m digging is required in a sand and pebble floor.
Draughts in. Can see for 10m (4m wide).
August 3rd - summer log -
2001s-21 -
dig
August 4th - summer log -
2001s-21 -
dig and survey. Lots more digging required
L=29m