Extra notes from card index
• L06E: Foamed and stabilised. Photos.
(No log book account.)
• Summer '07: Video from PP on system.
Orphan card index date references to logbook pages
• [31/07/2001] Dug.
• [03/08/2001] Surveyed. TL=35.3 d=11m
• [29/07/2006] Dug
• [30/07/2006] Dug and stabilised
• [23/03/2018] IR photos.
• [21/09/2024] Email re new exploration in Volcano.
Dated logbook entries with card index notes
1999
April 4th - Easter log -
1999e-14 -
Small cave 2x3m.
No draught.
2001
April 11th - Easter log -
2001e-13 -
Volcano. Dig started. Good draught.
April 12th - Easter log -
2001e-14 -
Continued
April 14th - Easter log -
2001e-18
April 15th - Easter log -
2001e-31
January 1st - summer log -
2001s-17
July 30th - summer log -
2001s-13 -
Dug.
2002
March 25th - Easter log -
2002e-02 -
Dug. Needs heavier gear.
January 1st - Easter log -
2002e-30
April 2nd - Easter log -
2002e-20
2003
April 19th - Easter log -
2003e-14 -
Further digging.
August 13th - summer log -
2003s-36 -
Dig
August 15th - summer log -
2003s-36;
2003s-37 -
Latest digging of a couple.
2004
April 18th - Easter log -
2004e-45 -
See email dated 18/4
Surveyed accurately to join entrance with chamber.
Snappered. Muddy dig - wet.
August 2nd - summer log -
2004s-23 -
Further digging. Good draught.
2005
November 11th - autumn log -
2005a-10 -
Further snapping - little effect.
Needs 1.5kW jack hammer and generator.
November 12th - autumn log -
2005a-20
2007
March 3rd - February log -
2007f-10
January 1st - Easter log -
2007e-38
April 3rd - Easter log -
2007e-04 -
Dug through to 3m climb down and 6m pitch into 15m x 5m chamber with large blocks on the floor. Now needs snappers and props.
About 4 beds of sandstone passed through. One 1.2m thick.
Surveyed 35.8. Photos.
TL=70.1 d=28m
January 1st - summer log -
2007s-63
2011
January 1st - Xmas - New Year log -
2011c-02
2018
March 22nd - Easter log -
2018e-01
2023
August 3rd - summer log -
2023s-27 -
Re-inspection. Some digging done. Needs shoring.
Resurvey TL=74m d=29m
(Extended into chamber seen in 2007.)
September 21st - autumn log -
2023a-01
2024
September 11th - autumn log -
2024a-01 -
Drawing received.
Published documents: print and digital
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p19 - Summary.
• [EQ]
Corrin Juan, 2003b Expedition Report: Matienzo, Spain 2002 Speleology Issue 3, September 2003
• p16 - Summary.
• [EW]
Corrin Juan, 2005 Expedition Report: Matienzo, Spain 2003 Speleology Issue 5, December 2005 BCRA
• p14 - Summary.
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p18 - Summary
• p24 - photo.