Extra notes from card index
• 30T 0450718 4795271 ^370
This is 2m above entrance at wall.
Orphan card index date references to logbook pages
• [30/12/1998] Surface survey.. See Cefrales (42) file.
Entrance coords not altered because of this.
Dated logbook entries with card index notes
1998
July 31st - summer log -
1998s-06;
1998s-07 -
Discovered
August 2nd - summer log -
1998s-09;
1998s-10 -
Explore. Tight rift needs enlarging.
Surveyed. L=82.7 d=22.7m
August 6th - summer log -
1998s-18 -
15m p found. Hilti capped rift.
Still possible.
August 7th - summer log -
1998s-19 -
Dropped pitch. Draughts out at base - but too narrow.
August 16th - summer log -
1998s-33 -
Opened up Hilti dig to get into parallel shaft.
Drops a further 10m with possible continuation below.
August 17th - summer log -
1998s-34 -
At base of above is a bedding to a 25m pitch which needs descending.
1999
March 30th - Easter log -
1999e-04 -
Pole into main chamber up to hole. A foot of rock would need removing.
Climb done and some hammering of top of tight p.
April 2nd - Easter log -
1999e-08 -
Cable for drill left behind.
April 3rd - Easter log -
1999e-08 -
Hilti capping hole scaled to. Nearly through.
April 5th - Easter log -
1999e-18 -
Through hammered and Hilti hole.
April 6th - Easter log -
1999e-18;
1999e-19 -
Not enough gear to drop pitch. Surveyed to head of pitch
L=130m d=44m
July 27th - summer log -
1999s-04 -
Rigged Los Molinos pitch into large passage choked in both directions. 129m surveyed.
L=259m D=74m
July 29th - summer log -
1999s-10 -
Dave's Big Chamber looked at. Photos.
22m rope left in for 50ft pitch.
TL=309m
August 3rd - summer log -
1999s-21;
1999s-22
August 5th - summer log -
1999s-22;
1999s-23;
1999s-27
2000
April 26th - Easter log -
2000e-27;
2000e-28;
2000e-29 -
Various extensions not surveyed from "Hammerless Pot"
Still going.
2001
April 13th - Easter log -
2001e-18;
2001e-19;
2001e-20;
2001e-22 -
(1) Big pitch - UnTerryfied" Shaft.
128m in total. Sketch.
(2) "Stop-Go" Passage explored to within a few metres of 457 + 458.
Total surveyed =331.7+128 =459.7
TL=459.7+933.4 = 1393.1m d=195m
2002
August 7th - summer log -
2002s-14
2006
April 15th - Easter log -
2006e-24 -
Entrance GPS located.
Crawl explored 20m 210° from entrance. Needs snappers to continue. Draughts.
April 16th - Easter log -
2006e-25 -
Removed rock but can see too small for 3m. Surveyed L-25m
TL=1393.1+25 = 1418.1 d=195m
2007
January 1st - Easter log -
2007e-38
April 1st - Easter log -
2007e-29 -
Surveying in Pedro's Pot area.
Found 2 shafts to right just after C5. Closed down in rifts.
Batch 07-01 and 07-02
68.5 + 47.8 = 115.3
TL=1533.4m
(account after 9/4)
April 2nd - Easter log -
2007e-29
January 1st - summer log -
2007s-63
Published documents: print and digital
• [DY]
Corrin Juan, 2000 Matienzo '99 Caves & Caving 87, Spring/Summer 2000
Summary and survey.
• [EP]
Corrin Juan, 2003a Expedition Report: Matienzo, Spain 2001 Speleology Issue 2, May 2003
• p18 - Summary.
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p18 - Summary.