Extra notes from card index
• L99 - dates not mentioned
2 - Capped to head of new pitch (11m)
3 - Down 11m pitch to tight rift - pushed about 70m with awkward climb and tight squeeze. 2 pitches dropped beyond squeeze. 4 - A 20m to cross rift. Too tight on sandstone bed.
B - 5m to too tight.
5 - Detackled.
TL=131.2m d=77m
Orphan card index date references to logbook pages
• [02/08/1998] Surveyed to L=65.4m d=40.3m
• [09/08/1998] Detackled.
• [04/08/1999] Tackled up. Head oflast pitch enlarged. Dig in bottom of final chamber.
Dated logbook entries with card index notes
1998
July 29th - summer log -
1998s-04 -
Shakehole dig and ladder into large 20m long chamber with stream and calcite slope.
July 30th - summer log -
1998s-04
July 31st - summer log -
1998s-06 -
Explore and survey. Still going.
L=41.5 d=26.4m
August 4th - summer log -
1998s-09;
1998s-17 -
Hilti cap at top of "12m" pitch.
August 6th - summer log -
1998s-18 -
Hilti cap and dig at top "12m" pitch.
August 8th - summer log -
1998s-21 -
Now 3 live holes with bar sticking out.
August 12th - summer log -
1998s-24 -
Hilti caps blown.
Descended to some draughting possibilities.
Left 'til next year.
1999
August 12th - summer log -
1999s-37;
1999s-38
2005
October 24th - autumn log -
2005a-01
2007
July 27th - summer log -
2007s-01 -
Entrance shakehole has blocks in from the mobile phone mast building works (photo).
Published documents: print and digital
• [FF]
Corrin Juan, 2007a Expedition Report: Matienzo, Spain 2007 Speleology Issues 10/11, December 2007 BCRA
• p19 - Summary.