April 10th - Easter log -
1996e-30 -
Middle, walk-down entrance to Orillón.
Given own number.
See site 23 for future entries.
January 1st - summer log -
1999s-50;
1999s-51
August 8th - summer log -
2015s-37 -
Resurvey entrance series.
August 11th - summer log -
2015s-44;
2015s-45 -
New shaft connects at inlet (by smoke only).
See 4201.
August 16th - summer log -
2015s-49 -
Resurvey upstream and high level passages.
August 19th - summer log -
2015s-50 -
Main streamway resurveyed. Surface survey to 1161.
30T 454372 4794535 ^262
August 28th - summer log -
2015s-52 -
Squeeze passed at end into small chamber + continuing dig. Draught.
August 29th - summer log -
2015s-52
November 14th - autumn log -
2015a-08 -
5 hours digging at end. 4 people needed.
November 24th - autumn log -
2015a-11;
2015a-14 -
OB into cave.
November 26th - autumn log -
2015a-12 -
Detected @ Esquileña. See web site for details.
January 16th - Jan-Feb log -
2016jf-04;
2016jf-05
January 17th - Jan-Feb log -
2016jf-04
January 18th - Jan-Feb log -
2016jf-04
January 19th - Jan-Feb log -
2016jf-04
January 20th - Jan-Feb log -
2016jf-04 -
Optical brightener into cave. Eventually detected @ N spring @ Mortiro depression (site 4272) then 4271 Esquileña.
March 30th - Easter log -
2016e-34 -
Capping and digging at end. Entered chamber first seen in 1974.
Climbed 3m to small draughting rift.
August 4th - summer log -
2016s-31 -
Dig at stream sink in final chamber. 2m down in mixed sediments - clay and gravel.
November 12th - autumn log -
2016a-05
April 29th - Easter log -
2019e-51 -
Collecting spiders in "entrance series". Photos.