MCP Site Information Sources (logbooks; card index; print and digital publications)

Data tables updated on 1st January 1970. User Manual
No. of documented sites is 5586 : Card index (references) table has 22158 records : There are a total of 21866 logbook entries.
#1017 Socks
La Secada - 30T 0451290 4797538 Altitude: 223m - Length: 25m Depth: 16m
Website description for site 1017   |   Site in context, area map

Dated logbook entries with card index notes

1995

July 30th - summer log - 1995s-21 - Draughting dig.
August 9th - summer log - 1995s-72 - Boulders need removing. Good draught.

2007

July 31st - summer log - 2007s-13

2014

August 7th - summer log - 2014s-43; 2014s-44 - GPS. 30T 0451290 4797538 ^223 Capped large rock. Dug down 2m.Looks promising.
August 8th - summer log - 2014s-44 - More digging.
August 9th - summer log - 2014s-49 - Mofre digging

2015

July 26th - summer log - 2015s-04 - Inspected.
July 27th - summer log - 2015s-05 - Some digging. Now v. Awkward. 10Gb GoPro video

2017

August 6th - summer log - 2017s-29 - "Socks" Appears to have "self-excavated"* and depth now 11.5m. But too tight at base. Draughts. * Opened up 2015
October 4th - summer log - 2017s-57

2018

April 1st - Easter log - 2018e-12 - Cleared out. Needs capping.
August 19th - summer log - 2018s-58; 2018s-59 - Enlarging.

2019

April 20th - Easter log - 2019e-41 - Snapper used. 5 bags of rubble removed. More work needed.
April 24th - Easter log - 2019e-47 - Snapper used. Free climb down into 4x4m chamber. Possible dig under boulder. Needs hot day to follow draught. Surveyed. L=25.44m d=16m

2021

August 5th - summer log - 2021s-18
August 7th - summer log - 2021s-27; 2021s-28 - More digging.

2022

August 1st - summer log - 2022s-14 - More digging.
August 5th - summer log - 2022s-25 - Entrance made bigger.

2023

April 5th - Easter log - 2023e-12 - Further enlarging and digging.

2024

July 30th - summer log - 2024s-18 - Inspection. Very strong draught.
July 31st - summer log - 2024s-26 - Enlarge entrance shaft.
August 1st - summer log - 2024s-26 - Step cutting.
August 5th - summer log - 2024s-32 - Step cutting
August 6th - summer log - 2024s-32 - Enlarging shaft top.
August 8th - summer log - 2024s-50 - Cap down shaft.
August 10th - summer log - 2024s-53; 2024s-54 - Further work. Most draught enters higher up than base.
August 15th - summer log - 2024s-71; 2024s-72 - Further work at entrance.
August 18th - summer log - 2024s-76 - Media download.
August 19th - summer log - 2024s-76 - Capping bar broke.
October 29th - autumn log - 2024a-28 - Visited. Very strong draught.

2025

April 15th - Easter log - 2025e-14; 2025e-14; 2025e-45; 2025e-45; 2025e-46; 2025e-46 - Digging. Photos in log later.
August 12th - summer log - 2025s-40 - Digging below ledge. More digging but not recorded in log book.
August 15th - summer log - 2025s-61 - More capping and digging.

Published documents: print and digital